660
As a second day of making product, we welded the frame, leg and steel plate. In addition, we used lathe to make the shaft fits the bearing. Also we polished every parts to make it easier to draw. Our group finished 75% of our manufacturing process.
fantastic6 2018-08-08
Making a Product
659
Today, we have made another progress of our product. We have commpleted our structure and covers. Then we make our filters, its progress is 80% for now. We also completed our pyramid. For the assembly process, we have done 50% of the progress. Overall progress is 70% for today.
acekoreanesia 2018-08-08
Making a Product
658
We completed our total process 70%
a3dsquad 2018-08-08
Making a Product
657
Today we finished polishing stainless and left drilling and assembling part our product has reached 60%
antvengers1 2018-08-08
Making a Product
656
Our progres to day are assembly wood become frame, atteching bamboo to frame, polishing the wood, and make PPT. Our progres is 75%
xhunters2 2018-08-08
Making a Product
655
This second day that we make product. The picture above show that activities our team today. We almost finish to make painting table. Over all our progress is about 85%.
buffalo6 2018-08-07
Making a Product
654
Today our group's progress is to make sure the frame iis strong, then install zinc and plywood ini the frame, iinstall the door Aboge and below. Today our product has reached 75%
inkor7 2018-08-07
Making a Product
653
we've done 80%
luckyrookie 2018-08-07
Making a Product
652
12
luckyrookie 2018-08-07
Making a Product
651
Since the material shop doesn't have materials we needed, we did modify some part of product. making product process is 51% done.
buffalo 2018-08-07
Making a Product