The progress of our group today ia starting from measuring material, cutting it, and forming a frame work, beside that our product have also given glue to our products, maybe our product has reached 40%
Today our group's progress is to make sure the frame iis strong, then install zinc and plywood ini the frame, iinstall the door Aboge and below.
Today our product has reached 75%
The progress of our team on the 3rd day is to put a handle inside the frame, install the zinc under itu and place the driver, and paint on the outer wall